CIPP Trenchless Pipe Lining

How it Works

Old, failing sewer pipes can be rehabilitated without excavation


This NO-DIG TRENCHLESS SEWER REPAIR process simultaneously rehabilitates the connection and the lateral service pipe for up to 600 FEET in Length.

A resin-saturated felt tube suitable for resin impregnation, is inverted into a damaged pipe. It is usually done from the upstream access point (manhole or excavation). 

Little to no digging is involved in this trenchless process, making for a potentially more cost-effective and less disruptive method than traditional “dig and replace” pipe repair methods.

The SCS System is designed for 2″ – 8″ pipe diameters. The system can be installed through clean-outs or open end pipes. Only one access point is required. The liner can be  hot water cured in as little as 30 minutes. 2″ to 4″ diameter pipes can be rehabilitated up to 120FT+ in length, while 5″ to 8″ diameter pipes can be rehabilitated up to 600FT + in length. This is best selling small diameter pipeline rehabilitation system in North America!


Features:

  • 2” to 4” lining, 120FT +
  • 5” to 8” lining, 600FT +
  • 3” to 4” and 4” to 6” pipe flow transitions
  • Styrene-Free Resin
  • Any Pipe material: Cast, Clay, PVC, etc.
  • Minimum lifespan 50-years per ASTM F 1216 Third Party Testing
  • UPC Listing (Uniform Plumbing Code)
  • ICC-ES PMG Listing
  • IRC Listing (International Residential Code)
  • IPC Listing (International Plumbing Code)
  • IAPMO Classified Marking
  • NSF / ANSI Standard 14 Certification and Q.A. Program
  • Third party tested and certified Environmentally Safe
  • Third party tested and certified Odorless Materials